The Aldar Headquarters Building, Dubai

Release date: 23.10.2020 14:06



The HDL Dubai team have installed automation solutions into what can only be described as one of the most spectacular buildings in the Middle East. Named as the worlds ‘Best Futuristic Design’ the Aldar headquarters building covers an area of 61,900 m2, and has been designed to make use of ‘Golden Ratio’ which has been used in many of history’s greatest buildings.

 

20200323171458538.jpg

 

Full HDL automation solutions were installed into all the building’s offices and communal areas. One panel is enough for an office. Besides, the system will automatically adjust the lighting according to actual conditions. With a mixture of dimmers, relays, sensors, and panels, the Aldar building is now not only environmentally responsible but incredibly energy effect.

 

20191025104640514.jpg

 

20191025104640539.jpg



Share it: Facebook Twitter Linkedin Youtube Ins

  • Ela Excellence Resort Belek, Antalya Ela Excellence Resort Belek, Antalya

    23.10.2020

  • Swissotel Residences Çeşme, İzmir Swissotel Residences Çeşme, İzmir

    23.10.2020

  • The Westin Nişantaşı, İstanbul The Westin Nişantaşı, İstanbul

    23.10.2020

  • Rixos Sungate Otel, Antalya Rixos Sungate Otel, Antalya

    06.09.2021

  • The Land Of Legends, Antalya The Land Of Legends, Antalya

    06.08.2021

  • DoubleTree by Hilton City Centre, Antalya DoubleTree by Hilton City Centre, Antalya

    23.10.2020

  • DoubleTree by Hilton Yüksekova DoubleTree by Hilton Yüksekova

    23.10.2020

  • Garagum Otel, Turkmenistan Garagum Otel, Turkmenistan

    23.10.2020

  • Kempinski Bali Kempinski Bali

    23.10.2020

  • Macau, China - Morpheus Hotel Macau, China - Morpheus Hotel

    23.10.2020