Electricity Administrative Building, Ecuador

Release date: 02.11.2020 12:46



The main purpose of realizing the intelligent control is to create the safe, effcient, convenient and comfortable working and living environment of a building. HDL Ecuador completed a intelligent control project of the local electricity administrative building.

 

HDL Ecuador completed an intelligent control project of the local electricity administrative building. In this project, the auditorium, director's office and the main conference room in the building are automated by Htsingenieria to control lighting, curtains, HVAC, elevators and so on.

 

Users can enjoy the full beneffits of comprehensive intelligent control solutions through the HDL system. At the same time, the uses can manage various devices more intuitively via the iRidium software that has a powerful user interface and is easy to use.

20191025143620097.jpg

 

20191025143619252.jpg



Share it: Facebook Twitter Linkedin Youtube Ins

  • Ela Excellence Resort Belek, Antalya Ela Excellence Resort Belek, Antalya

    23.10.2020

  • Swissotel Residences Çeşme, İzmir Swissotel Residences Çeşme, İzmir

    23.10.2020

  • The Westin Nişantaşı, İstanbul The Westin Nişantaşı, İstanbul

    23.10.2020

  • Rixos Sungate Otel, Antalya Rixos Sungate Otel, Antalya

    06.09.2021

  • The Land Of Legends, Antalya The Land Of Legends, Antalya

    06.08.2021

  • DoubleTree by Hilton City Centre, Antalya DoubleTree by Hilton City Centre, Antalya

    23.10.2020

  • DoubleTree by Hilton Yüksekova DoubleTree by Hilton Yüksekova

    23.10.2020

  • Garagum Otel, Turkmenistan Garagum Otel, Turkmenistan

    23.10.2020

  • Kempinski Bali Kempinski Bali

    23.10.2020

  • Macau, China - Morpheus Hotel Macau, China - Morpheus Hotel

    23.10.2020